We took a big step and moved the old kitchen into the new addition temporarily until we build cabinets and buy some appliances. Worked out pretty well. The sink area was in the same configuration as the new one so fit well. The old peninsula became the new island. Everything else just found a place. By making this move, we can complete the electrical and plumbing in the old part of the house so we can get our last rough inspections. Once that is complete, we can start finishing the entire house.
Thanks to Tim Cole for coming up for the weekend to help us.
Sunday, February 13, 2011
Sunday, February 6, 2011
Railing on Loft
Tuesday, January 11, 2011
Tuesday, January 4, 2011
Putting on the wood sealer
Last few days have not been very eventful but have been productive. Now have the clear wood preservative on 80% of the high ceiling and timber frame. Only have the scaffolding one more week so focusing on everything high.
Thursday, December 30, 2010
First Update (and last) for 2010
We'll, finally getting to spend some serious time working on the addition. Although we have made some progress over time, just now feeling like we might getthis done.
On the exterior, we have completed the roof on the addition and the channel siding (still have some rock and shingle siding to do).
Sunday, March 16, 2008
Tuesday, February 12, 2008

Has been a while since last update for good reason. Really have not done that much. Working on plumbing, electrical and some interior items. Thanks to Louise (Renee's mom) for helping out with loft floor installation and pulling wire for the kitchen electrical. We also got all the soffit cedar material stained during one warm day (the only day that has been over 40 deg since November). Will start to install that as weather get s better (at least around freezing). 

Wednesday, January 2, 2008

Progress has slowed to a crawl over the holidays (somewhat intentional, some due to really cold temperatures). Plumbing and electrical contiues to get done. Garage Doors were installed on Dec 31st. Still need some decorative hardware but look pretty good. Wood on doors is same as siding will be on house (vertical on doors, horizontal on house). See photo.
Thursday, December 13, 2007

So progress has seemed slow although we continue to get work done. Inspections on the new power panel are complete (and approved). Still waiting for Xcel Energy to come and switch our main power from one panel to to other. This will be a fun day because we lose all our heat and lighting until I rewire the old panel (good to have a generator and a wood stove). Now have the stairs installed so can access the house through the garage. Work now is aimed at getting the rough electrical, plumbing and mechanical complete so we can get the next round of inspections completed (then we can start to do some insulation). Windows should show up on the 18th. Garage doors should be about the same time.
Pictures are of stairs, utility room in garage, and the new table saw.

Pictures are of stairs, utility room in garage, and the new table saw.Wednesday, November 21, 2007
Saturday, November 10, 2007


Good progress, and none to soon. 50% chance of snow for Monday. Roof is not completely sheathed but better than nothing. The framer hoped to be done today but just taking longer than estimated (nothing new).
Pictures of tubing are the radiant floor heat we are retrofitting into the existing house (in the crawlspace).

Pictures of tubing are the radiant floor heat we are retrofitting into the existing house (in the crawlspace).Saturday, November 3, 2007
Great weather has allowed good progress on the framing. A 3 man crew has been working for 8 days now and is about 60% complete. Weather looks good for another week so hope to have the roof on and covered.Timber framer is complete except for some sanding and touch up work. Probably won't get the windows in till mid December.
Sunday, October 28, 2007
Saturday, October 20, 2007
Thursday, October 18, 2007
Wednesday, October 10, 2007
Monday, September 24, 2007
I've been a bit delinquent at updating the blog. Progress is being made but is not that visible. The excavator is finally complete backfilling the foundation. We had to bring in 7 trucks of fill (after hauling out over 30 since we had no place to store). The timber framer is about 50% complete preparing the timber frame. He is hoping to raise it around October 15th. We did get the power lines, well power, comcast, quest, and the propane lines buried as well. Propane tank will be delivered on Wednesday. The material for the radiant heating system will begin showing up so we can retrofit the existing house. Overall have had great weather. Did get about 2" of snow one day but was gone the next.
We are also trying to contract to get the roof and remaining walls framed so that we are closed in before any big snows.
Sunday, September 2, 2007
Sunday, August 26, 2007